Hello. New customer? Start here.   
Home    About Us    Contact Us    Order Status    Wish List    Login 
 

Search
Advanced Search

Shop with Confidence
  
  
  Lowest Price Guarantee
  
  
  
  

 
 
 
Generac Guardian RTSD200A3
View Larger
 
RTS-D-200A3 200 Amp Automatic Transfer Switch
120/240 V Single Phase
 
0.0
Be the first to Write a Review
 
  Share  
 
Item#:  RTS-D-200A3
MSRP  867.00
Our Price:  685.00
You Save:  182.00 (21%)
Qty: 
 

Generac Guardian 200 amp Automatic Transfer Switch w/ Service Disconnect

Model RTS-D-200A3

(120/240 V Single Phase)

generac-transfer-switches
Nexus-Smart-Switch

Non-service rated (RTS-D SERIES)

Model

RTSD100A3

RTSD200A3

RTSD400A3

Amps

100

200

400

Voltage

120/240, 1

120/240, 1

120/240, 1

Load Transition Type (Automatic)

Open Transition Service Rated

Open Transition Service Rated

Open Transition Service Rated

Enclosure Type

NEMA 3R

NEMA 3R

NEMA 3R

Withstand Rating (Amps)

10,000

22,000

22,000

Lug Range

2/0 - #14

400 MCM - #4

600 MCM - #4 or 2-250 MCM

Unit Weight lbs.

22.5

39

140

kilos

9.97

17.69

63.5

The Nexus Smart Switch has the ability to manage two air conditioners without adding additional components or cost. Gain even more flexibility by adding up to our more individual DLM modules for additional load management.

100 - 400 Amp Service Entrance Rated Switch (RTS-D SERIES)
Our service entrance rated models include an integrated main breaker that eliminates the need for a separate service disconnect when backing up all of the electrical loads in a building.

All Smart Switches are housed in an aluminum NEMA/UL Type 3R enclosure, with electrostatically applied and baked powder paint. The Heavy Duty Generac Contactor is a UL recognized device, designed for years of service. The control at the generator handles all the timing, sensing and exercising functions.

Through the use of Digital Load Management technology (DLM), each of these switches has the capability to truly manage two air conditioning loads with no additional hardware. When used in tandem with the individual DLM modules, up to four more additional loads can be intelligently managed individually.

Item Number

Manual (PDF)

0H7446

MANUAL 100A&200A XFER SW S/D

0G6832

INSTALL 100/200A ENCLOSURE

SPECIFICATIONS

WHEN TO USE THE RTS-D SERIES SWITCHES

WHOLE HOUSE TRANSFER

RTSD SERIES

1. By monitoring generator engine performance, the switch is able to identify when the generator approaches overload. At the appropriate time, the switch disconnects two air conditioners, typically the highest electrical load in the house.

2. After a 5-minute delay to allow for compressor bleed out, the switch brings the AC units back online one after the other with a 30-second delay in between. This is a standard capability in all Generac Smart Switches and does not require any additional components, unlike competitive transfer switches.

3. In addition, up to four other large 240V loads can be managed when the Smart Switch is used in conjunction with individual DLM modules.

  • DLM modules are 50 Amps each and are housed in a NEMA 3R enclosure, giving the installer the option to install them either at the electrical panel or anywhere in-line indoors or outdoors between the electrical panel and the appliance.
  • After the four loads are shed, they are brought back individually to assure DLM Module generator capability and eliminate the potential of overload.

DIGITAL LOAD SHED MODULE

generac load shed module

SEQUENCE OF OPERATION

  • The 4 green status LEDs will indicate when a load priority level is enabled.
  • All loads are enabled when the transfer signal is off. (ATS in Utility position).

    If the transfer signal is pulled low (Active)

  • All loads are enabled until an overload is detected
  • When an overload is detected all loads are disabled
  • After 5 minutes priority 1 loads are enabled.
  • After another 30 seconds priority 2 loads are enabled
  • After another 30 seconds priority 3 loads are enabled
  • After another 30 seconds priority 4 loads are enabled

If an overload is detected within 30 seconds of a level being enabled, all loads are disabled again and the sequence repeats. However, the level that caused the overload and all levels higher will not be enabled again for 30 minutes.

 

Average Rating: 
0.0


 
 


Power Outages

Grab this Headline Animator